CONTACT US
You are here: Home » information » INDUSTRY ENCYCLOPEDIA » HOW TO START MY ATTIC STEPLADDER INSTALLATION

HOW TO START MY ATTIC STEPLADDER INSTALLATION

Views: 65     Author: STABLEMASTER     Publish Time: 2016-04-20      Origin: Site


Nearly every home has a attic space, which is an excellent place for storing seasonal clothing, books, luggage, holiday decorations and other closet-clogging stuff. It is an efficient use of overhead space, however the challenge is to find a simple and safe way to gain access to the overhead space. The best way is to get a attic stepladder. But how to install it?


home ladder


Take the Pull-Down Attic Stairs as an example, here are the home Stepladder Installation Instructions:


Step 1: Cut Out Attic Access Opening

Draw the lines in chalks onto the ceiling to mark the rough opening of the attic staircase. It is very necessary regardless of whether you're expanding an existing hatchway or creating new attic access. Peek into the attic and try to ensure there aren't any ducts, wires or pipes in the way. Then cut out the rough opening with a drywall saw.


Step 2: Remove the Joists or Other Obstructions

Cut out the ceiling joist and any wood blocking which is in the opening. Leave the header from the hatchway in place and use it to form one end of the rough opening. Then nail a new header between the joists on the opposite end of the rough opening to complete the framing. Secure the drywall ceiling to the new framing with nails or screws driven up from below.


Step 3: Set up the Opening Frame

Temporarily screw a pair of 1x3 cleats to the ceiling across the rough opening. Build a finished frame out of 1x8s to fit snugly into the opening. Lower the frame down onto the cleats from above, then fasten it to the framing with 16d nails or 1/4-inch-diameter, 3-inch lag screws. Remove the temporary 1x3 cleats.


Step 4: Install the Door Panel

Install the door panel to one end of the finished frame with the continuous hinge provided with the staircase. Check the swing of the door, making sure it closes without binding and that it fits flush within the frame.


Step 5: Put Up the Spring Drums

Next, screw the left-hand spring drums to the 1x8 frame directly above the door hinge and up against the header. Mount the right-hand spring drums on the opposite side of the frame. Attach the header-guide frame between the two sets of drums; it will be used later to hold the upper end of the staircase in position.


Step 6: Install Pulley System

Screw a small cable pulley to each side of the finished 1x8 frame; position each pulley 20 inches from the header that's opposite the door-panel hinge. Attach each small pulley with three 1-inch-long screws. Bore pilot holes first to avoid splitting the 1x8 frame.


Step 7: Assemble the Staircase

Slip the stair treads into the angled dadoes milled in the two stringers. Secure each pine tread with four screws. Then use a wrench to tighten the threaded ladder rods that pass beneath each tread. Leave out the top three treads so you can easily fit the staircase between the header-guide frame mounted above the door panel.


Step 8: Attach Staircase to Door Panel

Stand the assembled staircase in the opening and have someone support the base as you climb up part way. Grab the top of the stringers and squeeze them in until the slide bars on the header-guide frame slip into the channel grooves on the outside of the stringers. Now install the top three stair treads. Slide the steel door-guide frame onto the staircase, then attach it to the door panel with six 1-inch-long screws.


Step 9: Mount Cable Holders

Using the pilot holes located near the fourth tread, mount cable holders to the side of each stringer. Reach up to one of the spring drums, grab the cable closest to the header and carefully pull it out. Pull the cable across the small pulley and down to the cable holder mounted to the door. Hook the cable end onto the holder. Use the same procedure to connect the cable from the drum on the other side of the stair.


Step 10: Calibrate Tension for a Smooth Glide

Adjust the tension on the cables until the staircase glides smoothly up into place and closes without slamming shut. If the door doesn't close all the way, increase the tension by disconnecting the cables, winding them around the spring drums two times; then reconnect them. Finish by nailing casing molding around the perimeter of the opening; paint it to match the ceiling.


Actually, it is quite complex to install a pull-down attic stepladder. For busy office single ladies, it may be a challenge to install a attic stepladder with their own efforts. Thus, why not choose a convenient foldable step ladder at STABLE MASTER? According to the height of the attic, we offer adjustable storied ladders with different stairs. What’s more, stepladders with handrail are much safer for home use. 


 

Zhejiang Stable Master Industry and Trading Co.,Ltd. is a professional manufacturer of ladders. We have more than 10 years in manufacturing steel tube and steel bars exceeds 20000 tons for one year.

Our main products:

kitchen step ladder    

4 ft ladder    

two step ladder    

diy step stool    

step stool ladder    

metal step stools    

step stool collapsible    

painting ladder for stairs    

12 foot step ladder    

two step stool    

If you are looking for Ladder manufacturer, please feel free to contact us !



ABOUT US
What Drives Us
PRODUCTS
COOPERATION
B2B
SERVICES
INFORMATION
Industry Encyclopedia
CONTACT US
Tel: + 86 579 8779 2086
       86 150 6802 1512
                18067643118
Mall: 
manager@stablemaster-ladder.com
 
sales2@stablemaster-ladder.com
 
 
 
Fax: + 86 579 8790 2089
Web:  www.stablemaster-ladder.com
WhatsApp:+86 150-6802-1512
Wechat : +86 150-6802-1512
Add: Wangzhai Industrial Zone, Wuyi, Jinhua, Zhejiang, China
© Copyright 2019 by Zhejiang Stable Master Industry & Trading Co., Ltd. Privacy Policy.